摘要
该文针对济宁矿业集团有限公司安居煤矿洗煤厂EPC总承包工程,主厂房生产控制系统设计与施工过程中所遇到的问题进行总结和思考。
This paper made a summary and thinking for the meeting problem in the process of design and construction of EPC general contracting project of the preparation plant, and the main plant production control system of the Jining mining industry group company limited.
出处
《山东煤炭科技》
2015年第6期204-205,208,210,212,共5页
Shandong Coal Science and Technology