期刊文献+

县区科技计划项目管理的现状与对策——以龙岩市新罗区为例 被引量:3

Situation and Countermeasures of County-level Sci-tech Plan Management——a Case Study of Xinluo District
下载PDF
导出
摘要 龙岩市新罗区科技计划项目管理工作还存在一定问题,县区科技计划项目管理部门应增强项目申报的指导性、完善项目评估体系,确保项目的实施效率与质量,在时间、组织工作及信用制度等多方面强化验收阶段的管理,采取多种措施提高科技成果转化率。 The sci-tech project management work plays an important role in promoting economic development and the progress ofscience and technology. There are some problems such as weak guidance in project establishment stage and lack of management inimplementation stage, making it a mere formality in acceptance stage and low level of the transformation rate of project achievementsthrough the analysis of the situation of management of sci-tech projects in Xinluo District. This paper has given some countermeasuressuch as enhancing project reporting guidance and perfecting the project evaluation system,strengthening management of the wholeprocess in implementation stage as well as strengthening management in time, organization and credit system in acceptance stage inorder to provide reference for the improvement and perfection of management level.
作者 陈万丽
出处 《龙岩学院学报》 2015年第3期90-95,共6页 Journal of Longyan University
基金 福建省2013年科技计划重点项目"提升新罗区科技管理与培训的条件建设"(2013N0101)
关键词 科技计划项目 项目管理 龙岩市新罗区 sci-tech plan project management Xinluo District
  • 相关文献

参考文献7

二级参考文献24

共引文献99

同被引文献8

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部