伊敏二号露天矿剥离外包可行性分析 被引量:3

Feasible analysis on stripping outsourcing in Yimin No.2 Open-pit Mine
下载PDF
导出
摘要 通过现场勘查、理论分析、方案对比等研究手段,对华能伊敏煤电公司二号露天矿的15-1至15-2煤层间剥离废石外包经济可行性进行了分析。结果表明:15煤层间58.0 Mm3/a的剥离工程量通过外包作业,具有明显成本优势,省去设备投资的大额费用,且采掘设备的选型、布置及道路运输条件都满足生产的相关要求。 Through scene investigation, theoretical analysis, scheme comparison, the article analyzes the feasibility of stripping waste rock outsourcing economy between No.15-1 and No.15-2 coal seams in Huaneng Yimin Coal and Electricity Company No.2 Open-pit Mine. The results show that through outsourcing operation, 58.0 Mm^3/a stripping quantity between No.15 coal seam has obvious cost advantages, which save large cost of equipment investment, and selection, layout and road transportation conditions of mining equipment meet requirements of production.
作者 张天骄
出处 《露天采矿技术》 CAS 2015年第5期87-90,共4页 Opencast Mining Technology
关键词 露天煤矿 剥离废石 外包作业 经济可行性 open-pit coal mine stripping waste rock outsourcing operation economic feasibility
  • 相关文献

参考文献1

  • 1王运敏.采矿手册(中)[M].北京:冶金工业出版社,2012.

同被引文献18

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部