本文针对大秦线重载运输中存在的限制因素,结合重载运输三种组织方式,提出四种重载列车组合形式并进行探讨,旨在优化设计列车组合形式,提高重载列车运输能力。
Aimed at the limiting factors in Daqin line heavy-load transportation, and combined with the three kinds of overload transportation organization, four kinds of heavy-duty train combinations are put forward and discussed, aiming to optimize the design of train combinations and improve the ability of heavy-load train transportation.
出处
《价值工程》
2015年第18期232-234,共3页
Value Engineering
关键词
铁路重载
运输组织方式
问题研究
railway heavy-load
transportation organization mode
problem study