摘要
以邻近水厂的纳雍县发展大道右侧高边坡为例。由于修建发展大道将影响水厂的安全,因此,通过对邻近水厂高陡边坡的稳定性分析,在此基础上,采取以预应力锚索为主、锚杆为辅的深层和浅表的全方位、多层次的加固体系,同时选用有针对性的施工工艺和技术,保证了高边坡的稳定和邻近水厂的安全。
For an example of the high slope Adjacent to Waterworks on the right side of Fanzhan Road, the construction of Fanzhan Road influences the safety of the waterworks. After analysis of stability of the high slope adjacent to Waterworks, the deep and shallow all-round and multi-layer reinforcement system is made mainly by pre-stressed anchor cables and secondarily by anchor rod while a targeted construction process and technology are selected to ensure the stability of the high slope and the safety of adjacent Waterworks.
出处
《路基工程》
2015年第3期191-194,共4页
Subgrade Engineering
关键词
发展大道
水厂
高边坡
稳定性
预应力锚索
Fanzhan Road
waterworks
high slope
stability
pre-stressed anchor cable