摘要
以郑州新郑机场东西贯穿道路指廊段顶板大体积混凝土浇筑施工为实例,介绍了该工程施工中为确保大体积混凝土连续浇筑的施工质量所采取的一系列方法,并分别从施工准备、现场布置、浇筑方案等多方面进行了阐述。
Taking the mass concrete pouring construction for the top slab of gallery section of the west- eat road of Xinzheng Airport in Zhengzhou as a case, the article introduces a series of methods taken for ensuring the construction quality of mass concrete continuous pouring in the construction of this project, and sets forth the construction preparation, field layout and pouring scheme.
出处
《城市道桥与防洪》
2015年第6期145-146,161,共3页
Urban Roads Bridges & Flood Control
关键词
大体积混凝土
连续浇筑
冷缝
mass concrete,continuous pouring,cold seam