水泥灌浆料套筒连接接头拉伸极限承载力试验研究 被引量:19

Experimental study on ultimate tensile bearing capacity of cement grouting sleeve connection
原文传递
导出
摘要 装配整体式框架结构的技术难点在于如何实现预制构件之间的可靠连接。为验证预制柱、预制梁之间水泥灌浆料套筒连接接头的可靠性,开展了9个水泥灌浆料套筒连接接头拉伸承载力试验,考察了套筒和钢筋直径大小对该接头拉伸承载力的影响。同时,仿真试验结果亦验证了采用水泥灌浆料套筒连接接头的可行性,为推广水泥灌浆料套筒连接接头的应用提供了依据。 The technical difficulty of assembled integral frame structure is how to realize reliable connection between the precast concrete components. In order to verify the reliability of cement grouting sleeve connection between PC columns and PC beams, nine tests on ultimate tensile bearing capacity of the cement grouting sleeve connection were carried out and the influences of the sleeve diameter and the steel bar diameter on ultimate tensile bearing capacity of the connection were investigated. The simulation test results also verify the feasibility of the cement grouting sleeve connection, which provides basis for popularizing the application of cement grouting sleeve connections.
出处 《建筑结构》 CSCD 北大核心 2015年第6期21-23,29,共4页 Building Structure
关键词 水泥灌浆料套筒连接接头 拉伸承载力 仿真试验 模型试验 cement grouting sleeve connection tensile bearing capacity simulation test model test
  • 相关文献

参考文献6

  • 1CECS43-92.钢筋混凝土装配整体式框架节点与连接设计规程[S].北京:中国建筑工业出版社,1992.
  • 2L莫克,E栗凯.钢筋混凝土装配式建筑[M].傅信祁,徐鼎新,等译.北京:中国建筑工业出版社,1985.
  • 3王东辉,柳旭东,陈勇.装配整体式混凝土结构的发展[J].混凝土,2012(1):113-115. 被引量:32
  • 4JG/T408-2013钢筋连接用套筒灌浆料[S].北京:中国标准出版社,2013.
  • 5JGJ107-2010钢筋机械连接技术规程[S].北京:中国建筑工业出版社,2010.
  • 6JG/T398-2012钢筋连接用灌浆套筒[S].北京:中国标准出版社,2012.

二级参考文献3

  • 1辽亍省住房和城乡建设厅.装配整体式混凝土结伺技术规程(暂行)[s].2011-02-01.
  • 2L·莫克,E·栗凯,著,钢筋混凝土装配式建筑[M].傅信祁,徐鼎新,等译.北京:中国建筑工业出版社,1985.
  • 3陆湘桥.日本工业化住宅一瞥[J].建筑施工,2001,23(4):207-209. 被引量:4

共引文献38

同被引文献116

引证文献19

二级引证文献220