期刊文献+

精确化装补球方法在大尹格庄金矿中的应用研究 被引量:7

Study on the application of accurate ball loading and addition in Dayingezhuang Gold Mine
下载PDF
导出
摘要 针对大尹格庄金矿选矿厂一段磨机中钢球尺寸偏大及补加球不合理等问题,应用精确化装补球方法对其装补球制度进行优化。工业应用效果表明:采用新的装补球方法后,在不改变磨矿细度的条件下,磨机单位处理量提高7.46%,选矿厂电耗降低6.10%,磨矿介质单耗降低4.24%。同时,工业应用实践也证明精确化装补球方法在金矿选矿中具有很好的应用及推广价值。 In light of the over-sized steel balls and the flawed ball addition system of the single stage grinding mills in Dayingezhuang Gold Mine, accurate ball loading and addition method was used to improve the ball loading and addition system. The industrial test results show that the use of the new method can increase a mill unit capacity by 7.46 % , reduce power consumption of the total plant by 6.10 % and grinding media consumption by 4.24 % with the same fineness. The applied investigation proves that the accurate ball loading and addition method is worth widespread application in gold mineral dressing.
出处 《黄金》 CAS 2015年第6期53-56,共4页 Gold
基金 云南省科技计划项目基金(2013FZ022)
关键词 精确化装补球方法 磨矿 节能降耗 球径半理论公式 金矿 accurate ball loading and addition method grinding energy saving and consumption reduction Duan's half-theory formula gold mine
  • 相关文献

参考文献6

二级参考文献17

  • 1段希祥,周平,潘新潮.球磨机精确化装补球方法[J].有色金属,2004,56(3):75-78. 被引量:41
  • 2段希祥.球磨机钢球尺寸的理论计算研究[J].中国科学(A辑),1989,20(8):856-863. 被引量:64
  • 3杜茂华,周平,段希祥.精确化装补球方法的应用效果研究[J].有色金属(选矿部分),2007(2):39-44. 被引量:10
  • 4黄宋魏,张博亚,沈志刚,胡娟,李燕华,邓云英.磨浮作业综合自动化系统[J].有色金属(选矿部分),2007(4):38-42. 被引量:5
  • 5塔加尔特AF 冶金部选矿研究院译.选矿手册,第二卷第二分册[M].北京:冶金工业出版社,1959.63-93.
  • 6安德烈耶夫CE 茨维列维奇BB 别洛夫BA 北京矿业学院选矿教研室译.有用矿物的破碎、磨碎和筛分[M].北京:中国工业出版社,1963.271-283.
  • 7段希祥.碎散物料P80和d95粒度及相互换算[J].有色金属:选矿部分,1985,(5):27-31.
  • 8段希祥.碎矿与磨矿[M].北京:冶金工业出版社,2006.
  • 9中南矿冶学院选矿教研室.1981年选矿年评[R].1983.
  • 10刘广泌.选矿节能年评[R].第二届选矿年评报告文集,1984.

共引文献68

同被引文献220

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部