燃煤电厂主厂房基础设计方案分析

Coal-fired Power Plant Main Building Foundation Design Scheme Analysis
下载PDF
导出
摘要 根据厂区地质情况和各建筑物使用要求,从主厂房基础荷载、主厂房的基础埋深分析主厂房结构特点,并从基础持力层的确定、承载力条件及基础型式对3种主厂房地基方案进行技术经济比较,最终分析确定独立和条形基础相结合的方案技术可行,并具有较高的经济性。 According to the geological condition of premises and the building use requirements, this paper analyzes the main building project structure from the main building base load and the main building base depth of burial, analyzes and compares technical and economic of the three main projects foundation projects through base load confirmation, bearing capacity and base type analysis, and confirms the projects is feasible combined with single and strip-type base, and has more economics.
作者 丁欣平
出处 《河北电力技术》 2015年第1期1-4,43,共5页 Hebei Electric Power
关键词 荷载分析 地基处理 湿陷性黄土 天然地基 load analysis foundation treatment collapsible loess natural foundation
  • 相关文献

参考文献5

  • 1GB50007—2011,建筑地基基础设计规范.
  • 2GB50025-2004.湿陷性黄土地区建筑规范.[S].,..
  • 3JGJ79-2012建筑地基处理技术规范[s],2012.
  • 4GB50011-2012,建筑抗震设计规范.
  • 5GB18306-2001,中国动参数区划图.

共引文献332

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部