期刊文献+

基于改进的WBS-RBS与FHAP方法的煤炭企业管理信息化项目建设关键风险识别 被引量:5

Key risks identification of management informatization projects construction for coal enterprises based on improved WBS-RBS and FHAP method
下载PDF
导出
摘要 煤炭企业管理信息化项目建设涉及范围广,风险因素比较多,结合煤炭企业管理信息化项目建设特点,对传统的WBS-RBS方法进行改进,构建WBS-RBS与管理相关方组合矩阵,可以系统识别企业管理信息化项目建设过程中的风险因素及管理相关方,在此基础上进一步构建煤炭企业管理信息化项目建设关键风险识别模型,通过FHAP方法对煤炭企业管理信息化项目建设关键风险进行识别,并确定其在煤炭管理信息化项目建设阶段的权重分布情况及管理相关方,从而提升管理信息化项目建设风险管理的针对性和有效性。 The construction of management informatization projects for coal enterprises involves a wide range of risk factors. Taken this feature into consideration, this paper improves the conventional WBS-RBS approach to build a portfolio matrix which combined WBS-RBS with relevant management. It can identify risk factors and the relevant management systematically during the construction o{ management informatization projects. Based on this, a key risks identification model is built for coal enterprises. Then, identify the key risks with the FHAP method as well as determine the weight distribution and relevant management during the construction stage of coal management informatization projects in order to enhance the pertinence and validity of risk management for management informatization projects construction.
出处 《中国煤炭》 北大核心 2015年第6期30-37,共8页 China Coal
基金 国家自然科学基金(41472259) 北京市自然科学基金(4133085)
关键词 煤炭企业 管理信息化 风险识别 WBS-RBS FHAP coal enterprises, management informatization, risk identification, WBS-RBS, FHAP
  • 相关文献

参考文献14

二级参考文献87

共引文献1727

同被引文献20

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部