2LIU Baochen, I/AO Guohua. Coal Mining Ground Surface Movements[ M]. Beijing: Chinese industry Press, 1965.
3布克林斯基BA.Rock and Ground Surface Movements[M].Beijing:Coal industry Press,1989..
4New B M, Bowers K H. Ground movement model validation at the heathrow express trial[J]. Tunnelling, 1994(3) :301 - 329.
5Liu Baochen. Ground sttrface movement due to underground excavation in the P R China. In: Comprehensive rock engineering(Vol,4) [M]. Pergaman Press, 1993.
6孙恒虎,黄玉成,杨宝贵.胶结充填技术[M].北京:冶金工业出版社,2002.
7Liu Baochen. Ground surface movement due to underground excavation in the P.R. China [ J ] . Comprehensive rock engineering. Vol. 4, Pergaman Press, 1993.
8Paul F. Hudak, David J. Wachal, Bruce A. Hunter. Managing subsurface property hazards: reactive soils and underground storage tanks[J]. Urban Water, 1999, (1) :237 - 241.
9M. Parise. Landslide Mapping Techniques and Their Use in the Assessment of the Landslide Hazard, Phys. Chem. Earth (C),2001,26(9) :697 - 703.
10Beutel, Thomas, Black.StuartSalt deposits and gas cavern storage in the UK with a case study of salt exploration from Cheshire [J].Oil Gas European , 2005,31 ( 1 ) : 31 - 35.