摘要
文章以委内瑞拉卡贝略新集装箱码头项目钢管桩自浮运卸船施工为实例,分别对大直径钢管桩在强涌浪海域自浮运卸船方案的制定、实施及卸船过程中遇到困难、问题的解决方法进行了分析和探讨,可为同类工程提供参考和借鉴。
Taking the unloading technology of steel tubular piles from vessel by self-floating in Puerto Cabello new container terminal project of Venezuela as an example, we analyzed and discussed the formulation and implementation of unloading large diameter steel tubular piles from vessel by self-floating in huge surges waters, and the solutions of the difficulties and problems in the process, which can provide references for similar projects.