摘要
对某电厂2台660 MW燃煤汽轮发电机组正压直吹式制粉系统泄漏原因进行了分析,提出不同漏点的治理方案,有效消除了制粉系统的泄漏缺陷。
The reasons of leakage defect of positive-pressure direct-fired system of two 660 MW coal-fired turbine generator units in a power plant were analyzed. The treatment measures for different leakage points were proposed. The leakage defect of the coal pulverizing system was eliminated effectively.
出处
《华电技术》
CAS
2015年第5期42-43,共2页
HUADIAN TECHNOLOGY
关键词
正压直吹式制粉系统
泄漏
磨煤机
落煤管
出粉管
密封
positive-pressure direct-fired system
leakage
mill
coal chute
coal powder discharge pipe
seal