介绍了重庆西永垃圾转运站的建筑背景、工程概况及工程总体设计方案,具体阐述了转运工艺、设备配置、车间工艺布置、除臭、渗沥液处理等设计内容,并论述了该项目特点及创新性。
The construction background, general situation and overall designing plan of Xiyong Waste Transfer Station in Chongqing was introduced. The designing contents of transportation process, equipment scheme,workshop layout,deodor- ization,and leachate treatment were expounded in detail. The characteristics and innovativeness about the project were ex- pounded.
出处
《环境卫生工程》
2015年第3期50-52,共3页
Environmental Sanitation Engineering
关键词
生活垃圾
餐厨垃圾
转运站
竖式压缩
domestic waste
food waste
waste transfer station
vertical compression