摘要
桥巩水电站是红水河上10座梯级电站的第9级。桥巩水电站混凝土施工具有工程量大、工期紧、强度高、工序多、不回避高温季节施工等特点。针对不同部位的施工条件和要求,提出相应的温控措施和混凝土类型设计。
Qiaogong Hydropower Station is the 9th cascade of 10 planned power stations on Hongshui River. Its con-creting work is characterized by large construction quantity, tight schedule, high construction intensity, much con-struction procedures, no interruption during hot season. In view of the construction conditions and requirements of different positions, corresponding temperature control measures and concrete design were put forward.
出处
《广西水利水电》
2015年第3期8-14,共7页
Guangxi Water Resources & Hydropower Engineering
关键词
混凝土工程
温控措施
设计
桥巩水电站
Concreting work
temperature control measure
design
Qiaogong Hydropower Station