摘要
本文通过研究康平纳铁路专用线引入宁阳东站南侧设站方案和北侧设站方案的可行性,以及专用线曲线布置方案或环形布置方案的优缺点。分别从工程投资、运输组织、城市规划及工程实施等方面进行方案比选,分析影响专用线接轨的主要因素。
The feasibility of this through the study of Kingpins Na special railway line in Ning yang east station located on the south side of station north station plan and scheme, advantages and disadvantages as well as the special line of curve layout scheme or annular arrangement scheme. For scheme selection aspects separately from the project investment ,transportation organization, city planning and project implementation, the main factors of influence line analysis of special line.