为保障长洲水利枢纽三线四线船闸工程建设的顺利进行,结合工程的地形地质条件、项目特点,分别从施工导流、施工方法、施工总布置、施工总进度等方面进行了全面的施工组织设计。
In order to ensure the smooth construction, a general construction organization was designed for the third and fourth ship locks of Changzhou hydro-complex from the aspects of construction diversion, construction method, general construction layout, general construction schedule etc., as well as the engineering geological conditions and the characteristics of the project.