摘要
京南电站尾水护坡为预制混凝土砌块面层,经过长年运行后由于洪水冲刷等原因造成面板部分剥离,危及工程安全。在工程除险加固中,运用土工模袋混凝土对水下部分进行整体修复,工程达到比较显著的修复效果,满足了业主方的要求。
Few precast concrete blocks, for protection of tailrace slope of Jingnan power station, dropped off from the faceplate due to floods and erosion during many years running. For reinforcing the slope protection, concrete bags were used for overall repair of the underwater parts, which got satisfactory repair results.
出处
《红水河》
2015年第3期20-22,共3页
Hongshui River
关键词
护坡
除险加固
模袋混凝土
京南电站
slope protection
reinforcement
bagged concrete
Jingnan hydropower station