烟台港西港区一期工程2006年得到国家发展和改革委员会核准,其后随着市场变化和总平面布置的调整,装卸工艺系统经过了多次反复研究,历时约7年起步工程才建成投产。本文对装卸工艺系统的设计工作进行整理回顾,以利后续类似工程的参考借鉴。
No.1 phase project of Yantai Port western harbor was approved by State Development and Reform Commission in 2006. No. 1 phase project of Yantai Port western harbor was constructed and put into operation lasting seven years. Along with changes in the market and layout adjustment, handling process system was repeated studied, the design of handling process system has been arranged and reviewed to give reference to the similar projects.