摘要
详细介绍在全球首座AP1000三代核电站穹顶吊装过程中,为减小吊装过程中潜在的风险,在项目前期如何运用虚拟施工技术建立3D模型全过程模拟整个穹顶的吊装过程。
Introduced how to use virtual construction technology to build 3D model to simulate the whole process of the dome lifting in the dome lifting in the three generations of the first AP1000 nuclear power plant in the world in order to reduce the potential risks in lifting process early in the project.
出处
《能源与节能》
2015年第6期76-77,共2页
Energy and Energy Conservation