期刊文献+

德国铁路列车运行线产品管理体系研究 被引量:1

Study on Management System of Train Operation Line Products on Germany Railways
下载PDF
导出
摘要 在阐述德国铁路列车运行线产品分类的基础上,分析列车运行线价格管理和列车准时运行管理。针对列车运行线产品制定的差异化的市场价格体系,主要由线路基本价格、列车产品系数,以及其他附加收费构成。德国铁路路网公司对列车运行线预定和注销收取相应费用。通过实施列车运行线激励体系,对路网公司和铁路运营公司不同原因造成的列车延迟进行收费,从而对部分重点列车的准时运行进行管理,达到减少列车延迟、提高路网利用效率的目的。 Based on expounding categories of train operation line products on Germany railways, this paper analyzes the price management of train operation line and the management of train punctual operation. Targeting with train operation line products, the differentiated market price systems was established, which mainly composed with basic price of line, coefficients of train product and other extra charges. DB Netz AG collects fees on the reservation and cancellation of train operation line. Through implementing the incentive system of train operation line, fee charging was taken on the train delay caused by different reasons of railway network company and railway operation company, thus taken management on punctuality of partial important trains, so as to achieve the objects of reducing train delay and increasing utilization efficiency of railway network.
出处 《铁道运输与经济》 北大核心 2015年第6期68-73,共6页 Railway Transport and Economy
基金 中国铁路总公司科技研究开发计划课题(2014X009-C)
关键词 德国铁路 列车运行线产品 管理体系 Germany Railway Train Operation Line Product Management System
  • 相关文献

参考文献8

  • 1DB Netz AG. Train Paths for Passenger Transport[EB/OL]. (2014-12-15)[2015-03-06]. http ://fahrweg. dbnetze.com/ fahrweg-en/product/train_path/train_path_products/passenger_ transport.html.
  • 2DB Netz AG. Train Path for Rail Freight Transport[EB/OL]. (2014-12-15)[2015-03-06]. http: //fahrweg.dbnetze. com/fahrweg-en/product/train_path/train__pathAgroducts/rail- freight_transport.html.
  • 3福尔克尔·布茨巴赫,狄方良(编译).德国铁路路网股份公司的线路使用费体系[J].中国铁路,2006(3):47-51. 被引量:7
  • 4DB Netz AG. The Train Path Pricing System of DB Netz AG[EB/OL]. [2015-03-09]. http: //fahrweg.dbnetze.com/ file/fahrweg-en/2410872/VUHk7gdSoKdKmHtS JcSEPvWc bt4/2432326/data/train_path__pricing_system 2015.pdf.
  • 5DB Netz AG. List of Applicable Charges for Train Paths from 14th December 2014[EB/OL].(2014-02-14)[2015-03-16]. http.. //fahrweg.dbnetze.com/fahrweg-en/product/train_ath/ thrainA_ath_prices/list _of_ charges_2015.html.
  • 6崔艳萍,侯敬.关于德国铁路改革的探讨[J].铁道运输与经济,2013,35(7):94-97. 被引量:21
  • 7DB Netz AG. The Train Path Incentive System Took Effect on 13 December 2009[EB/OL]. (2014-12-15)[2015-01- .26]. http: //fahrweg.dbnetze.com/fahrweg-en/product/train_ path/thrain_oath_prices/incentive_system.html.
  • 8DB Netz AG. The Train Path Incentive System by DB Netz AG: the Systematic Approach to Punctuality[EB/OL]. [2015-01-26]. http : //fahrweg.dbnetze.com/file/fahrweg- en/2410872/dKfc4edUCCsYOSCTyRP3 SFRg7gA/2432328/ data/train_path incentive_system_201 1 .pdf.

共引文献26

同被引文献2

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部