期刊文献+

残留矿柱回采过程中地压活动联合监测技术研究 被引量:5

STUDY ON JOINT MONITORING TECHNOLOGY OF GEOSTATIC ACTIVITY IN RESIDUAL PILLARS STOPING PROCESS
下载PDF
导出
摘要 残留矿柱的回采具有地质开采条件复杂,地压活动剧烈等特点,潜在的安全生产风险大。对残留矿柱及围岩体的监测是保障安全生产的有效手段,针对目前单一监测技术的局限性,提出不同监测手段联合监测的技术方案,实现各种监测指标互为印证,提高监测数据的可靠性和分析的准确性。给出了微震监测和常规应力应变监测联合监测技术在某矿山应用案例。结果表明该方法能够有效保障矿山安全生产。 Residual pillars stoping has the characteristics of complicated geological mining conditions and se- vere geostatic activity,which have potential risk to safety production. The monitoring of surrounding rock mass of re- sidual pillars is an effective means to ensure safety production. The monitoring method is suggested to solve the lim- itations of current single monitoring technology, which can realize a variety of monitoring indicators for mutual con- firmation and improve the reliability of monitoring data and the accuracy of the analysis. This paper presents a spe- cific case of micro-seismic and routing monitoring technology in a mine. The results show that the method can effec- tively ensure the safe production the mine.
出处 《矿冶》 CAS 2015年第3期15-17,共3页 Mining And Metallurgy
基金 "十二五"国家科技支撑计划项目(2012BAK09B03 2012BAB01B04) 国家国际科技合作专项项目(2011DFA71990)
关键词 残留矿柱 地压活动 常规监测 微震监测 联合监测 residual pillars geostatic activity routine monitoring micro-seismic monitoring joint monitoring
  • 相关文献

参考文献9

二级参考文献72

共引文献275

同被引文献48

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部