期刊文献+

考虑风电不确定性的机组检修鲁棒优化方法 被引量:18

Robust Optimization Method of Generator Maintenance Schedule Considering Wind Power Integration
下载PDF
导出
摘要 大规模风电接入电网给传统电力系统机组检修决策问题带来了新的挑战,如何在历史统计数据不足的情况下考虑风电对机组检修的影响成为难点之一。将鲁棒优化理论引入检修决策领域,构建机组检修鲁棒优化模型,并给出风电不确定集合的构造方法。模型以风电最恶劣情景下系统运行最优为优化目标,保证系统运行安全性,通过调整不确定集合边界,可控制鲁棒优化模型的保守性,实现决策的经济性与安全性平衡。算例对比证明所提模型和方法在计算效率和计算结果中的优势。通过调整保守性参数,鲁棒优化模型可获得比传统随机规划模型更优的结果。 The integration of large scale wind power brings great challenges to the classical generator maintenance scheduling in power systems. One of the major difficulties is that how to consider the impact of wind power on the maintenance schedule under the absence of historical statistic data of wind power. The robust optimization theory was applied to the maintenance scheduling problems and a robust optimization model, as well as the method of constructing uncertainty set of wind power, was proposed in this paper. The security of power system was reflected in the objective of the robust optimization model, which was to optimize the operation cost under the worst case of uncertainty factors. The economy of the optimal decision could be achieved by adjusting the boundary of uncertainty set to control the conservatism of the model. The computational efficency and advantage of the model are demonstrated by numerical examples. By adjusting the uncertainty set, the optimal maintenance schedule obtained from the robust model is expected to be better than the one from the stochastic programming model.
出处 《中国电机工程学报》 EI CSCD 北大核心 2015年第12期2919-2926,共8页 Proceedings of the CSEE
基金 国家重点基础研究发展计划项目(973项目)(2013CB228203) 国家自然科学基金项目(51177080) 新世纪优秀人才支持计划项目(NCET-11-0281)~~
关键词 检修计划 风电 鲁棒优化 不确定性集合 保守性 maintenance schedule wind power robust optimization uncertainty set conservatism
  • 相关文献

参考文献30

  • 1Cassady C R, Kutanoglu E. Integrating preventive maintenance planning and production scheduling for a single machine[J]. IEEE Trans. on Reliability, 2005, 54(2): 304-309.
  • 2Heo J H, Kim M K, Park G P, et al. A reliability-centered approach to an optimal maintenance strategy in transmission systems using a genetic algorithm[J]. IEEE Trans. on Power Delivery, 2011, 26(4): 2171-2179.
  • 3Hadji M M, Vahidi B. A solution to the unit commitment problem using imperialistic competition algorithm[J]. IEEETrans. onPower Systems, 2012, 27(1). 117-124.
  • 4Camci F . System maintenance scheduling with prognostics information using genetic algorithm[J]. IEEE Trans. on Reliability, 2009, 58(3): 539-552.
  • 5Nourelfath M, Fitouhi M C, Machani M. An integrated model for production and preventive maintenance planning in multi-state systems[J]. IEEE Trans. on Reliability, 2010, 59(3): 496-506.
  • 6Burke E K, Smith A J. Hybrid evolutional'y techniques for the maintenance scheduling problem[J]. IEEE Trans. on Power Systems, 2000, 15(1): 122-128.
  • 7陈少华,杨澎,周永旺,何瑞文.遗传和模拟退火算法在发电机组检修计划中的应用[J].电力系统自动化,1998,22(7):44-46. 被引量:21
  • 8Pandzic H, Conejo A J, Kuzle I, et al. Yearly maintenance scheduling of transmission' lines within a market environment[J]. IEEE Trans. on Power Systems, 2012, 27(1): 407-415.
  • 9Wu Lei, Shahidehpour M, Li Tao. GENCO's risk-based maintenance outage scheduling[J]. IEEE Trans. on Power Systems, 2008, 23(1): 127-136.
  • 10Wu Lei, Shahidehpour M, Fu Yong. Security-constrained generation and transmission outage scheduling with uncertainties[J]i IEEE Trans. on Power Systems, 2010, 25(3): 1674-1685.

二级参考文献96

共引文献502

同被引文献282

引证文献18

二级引证文献185

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部