期刊文献+

航天测控网调度的混合构造启发式算法 被引量:5

Hybrid constructive heuristics of space measurement and control network scheduling problem
下载PDF
导出
摘要 针对航天测控网调度问题,提出一种基于混合启发式的解构造算法。与其他构造启发式算法不同的是,本启发式算法充分利用了我国航天测控网调度需求的特点,包括优先级、任务之间时间间隔要求和一个需求包括多个相同任务要求等,综合考虑了任务局部和需求全局,融合最大可用窗口价值规则和最早可用窗口集规则。其优势在于通过动态选择构造启发式规则来提高求解质量。最后,通过仿真实验分析比较,该算法可以在不明显增加计算时间的基础上得到更高的初始解质量。 For the space measurement and control network scheduling problem,a hybrid constructive heu-ristics is proposed.Different from existing constructive heuristics,this heuristics takes advantage of characteris-tics of space measurement and control network scheduling requirements,including priorities,temporal intervals and multiple same tasks in one requirement.Considering both local tasks and the complete requirement,it in-tegrates the maximum valued available task window rule with the first available task window set rule.Its advan-tage is to improve the solution quality by means of dynamic choice of the two rules.Finally,through simulation cases and computational results analysis,it is found that this hybrid constructive heuristics can improve the solu-tion quality and increase less computation cost.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2015年第7期1569-1574,共6页 Systems Engineering and Electronics
基金 青年创新基金(GFZX04060103-02)资助课题
关键词 构造启发式 航天测控网调度问题 测控需求 约束优化问题 时间间隔 constructive heuristics space measurement and control network scheduling problem tracking,telemetry and command (TT&C) requirement constraint optimization problem (COP) temporal interval
  • 相关文献

参考文献12

  • 1凌晓冬,武小悦,刘冰,薛国虎,吴金美.卫星测控资源调度CSP模型研究[J].系统工程与电子技术,2012,34(11):2275-2279. 被引量:6
  • 2Schmidt M, Schilling K. A scheduling system with redundant scheduling capabilities for ground station networks[C]//Proc. of the International Workshop on Planning and Scheduling for Space, 2009:1 - 6.
  • 3Schalck S M. Automating satellite range scheduling[D]. Day- ton: Air Force Institute of Technology, 1993.
  • 4Barbuleseu L, Watson J P, Whitley L D, et al. Scheduling space-ground communications for the air force satellite control network[J]. Journal of Scheduling, 2004, 7(1) : 7 - 34.
  • 5陈峰,武小悦.天地测控资源一体化调度模型[J].宇航学报,2010,31(5):1405-1412. 被引量:13
  • 6Stottler R, Mahan K, Jensen R. Bottleneck avoidance tech- niques for automated satellite communication scheduling[C]// Proc. of the Infotech @ Aerospace, 2011.
  • 7Marinelli F, Rossi F, Noeella S, et al. A Lagrangian heuristic for satellite range scheduling with resource constraints [J]. Computers & Operations Research ,2005,38(11) : 1572 - 1583.
  • 8Stottler D. Satellite communication scheduling, optimization, and deconfliction using artificial intelligence techniques [C] // Proc. of the Infotech @ Aerospace, 2010.
  • 9陈理江,武小悦,李云峰.基于时间灵活度的中继卫星调度算法[J].航空计算技术,2006,36(4):48-51. 被引量:13
  • 10Gooley T. Automating the satellite range scheduling process [ D]. Dayton: Air Force Institute of Technology, 1993.

二级参考文献38

共引文献33

同被引文献55

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部