1[3]Okapuu-von A,Marceau R J,Malowany A et al.Design and operation of a virtual reality operator-training system[J].IEEE Transaction on Power Systems,1996,11(3):1585-1591.
2[4]Tam E K,Maurel C,Desbiens P et al.A low-cost PC-oriented virtual environment for operator training[J].IEEE Transaction on Power Systems,1998,13(3):829-835.
3[5]Tam E K,Badra F,Marceau R J et al.A Web-based virtual environment for operator training[J].IEEE Transaction on Power Systems,1999,14(3):802-808.
4[6]Yukihiro M,Toshinori Y.VR-based interactive learning environment for power plant operator[C].Proceedings of the International Conference on Computers in Education,2002.
5DEMEULEMEESTER E. Critical chain project scheduling: Do not oversimplify [J]. Project Management Journal, 2002, 33(4): 48- 60.
6HUMPHREY W. A discipline for software engineering, SEI series in software engineering[M]. Reading, MA: Addison-Wesley, 1995.
7BAUMERT J H, MeWHINNEY M S, MILLER T R. SoRwarv measures and the capability maturity model, CMU/SEI-92-TR-25 [R]. Pittsburghers: Carnegie Mellon University, 1992.
8MEITE A. Configuration management principles and practice[M].北京:清华大学出版社,2003.