摘要
以太原国电为例,重点阐述了不同结构形式钢板—混凝土剪力墙在深化设计阶段注意事项和施工过程控制难点,详细描述了钢板—混凝土剪力墙的钢板制作、安装、钢筋安装、混凝土施工各阶段的工艺流程,最终将大跨钢板墙的加工、制作技术上升到更高的层次,优化了传统的加工方法,提高了剪力墙中钢板的加工精度。
In the case of Taiyuan State grid corporation, expounds the different structure form of steel plate wall matters needing attention in deep- ening the design phase and construction process control difficuhy, details the production, installation of steel plate shear wall, reinforcement as- sembling, every stage of the concrete construction process, will eventually processing and production technology of long-span steel plate shear wall rises to a higher level, optimization of the traditional processing method, improve the machining precision of the steel plate shear wall.
出处
《山西建筑》
2015年第20期113-115,共3页
Shanxi Architecture
关键词
钢板剪力墙
焊接
加工
steel plate shear wall, welding, processing