摘要
在国际工程条件下,针对工程项目顺利履约,规避合同风险,提高经营效益的问题作了研究,通过埃塞DL大坝加高及修复项目的变更实例,对变更项目情况进行了汇总,综合分析了其发生过程和采取的措施,总结了工程变更经验。
Under the international projects, the paper indicates to avoid contract risks and improve economic benefits in engineering programs, sums up the changed programs according to the Ethiopian DL dam heightening and engineering change notice, and has the comprehensive analysis of the occurrence process and measures, and has the summary for the engineering change experience.
出处
《山西建筑》
2015年第20期240-241,共2页
Shanxi Architecture
关键词
大坝
变更
索赔
合同
dam, change, claim, contract