某300MW亚临界机组给水系统采用100%汽动给水泵和50%电动给水泵的配置,为保证机组在汽动给水泵Run Back(RB)工况下各主要参数在允许范围内,设计完善了汽动给水泵RB控制方案,并成功完成了汽动给水泵RB试验,为同类机组提供了一定得参考价值。
About the 100% steam-driven Pump and 50% motor-driven Pump of 300MW unit feedwater system, the design completed the steam-driven Pump runback control scheme for ensuring the unit main parameters in the range allowed, And then the RB test of steam-driven Pump is completed successfully and it gave some valuable references for the similar unit.