期刊文献+

论总图在煤炭矿井设计前期的重要性——以新疆塔什店矿区一号矿井为例

On the Importance of General View in the Early Design Stage of Coal Mine Well:Taking No.1 Mine Well in Xinjiang Tashidian Region as the Case
下载PDF
导出
摘要 本文以新疆塔什店矿区一号矿井为例,阐述了总图专业对于煤炭矿井设计前期的重要性,并通过在矿井工业场地合理选址、矿井建设与城镇规划关系及矿井建设对社会影响度等方面分析,说明了总图专业参与矿井前期设计的必要性,以期望提高总图专业设计的水平。 Taking No.1 mine well in Xinjiang Tashidian region as the example, this paper explains the importance of general view for preliminary design of coal mine well, and shows the necessity of the involvement of general view in preliminary mine well design through the analysis on the rational location of mine industrial sites, the relationship between coal mine well construction and urban planning and the impact of mine well construction on society, expecting to improve professional design level of general view.
作者 王庚
出处 《价值工程》 2015年第21期60-61,共2页 Value Engineering
关键词 总图 矿井设计 任务 general view mine well design task
  • 相关文献

参考文献3

  • 1煤炭工业企业总平面设计手册[M].煤炭工业出版社,1992,8.
  • 2《新疆邢美矿业有限公司塔什店矿区一号井可行性研究报告》.新疆煤炭设计研究院有限责任公司,2011,11.
  • 3《新疆邢美矿业有限公司塔什店矿区一号矿井工业场地规划选址论证报告》.新疆煤炭设计研究院有限责任公司,2014,3.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部