摘要
介绍了大型水轮发电机转子支架的主要结构,并结合东方电机在三峡、溪洛渡等大型水轮发电机转子支架立筋工地加工的实际情况,对加工的工艺过程、工装工具的总体工艺方案进行了详细论述。
This paper introduces the main structure of the rotor bracket for large hydro generators and discussion on the overall technical scheme of rotor bracket rib processing on site. Finally, the processing and machining tools are introduced in detail along with the actual situation of our factory for the in-situ bracl^et rib processing for the large-sized hydro generator rotors of Three Gorges Hydro-power Plant and Xiluodu hydro-power Plant.