3ENDRENYI J,ANDERS G J,BERTLING L,et al.Comparison of two methods for evaluating the effectsof maintenance on component and system reliability[C] ∥Proceedings of 2004International Conference onProbabilistic Methods Applied to Power Systems.Ames,Iowa,USA:Iowa State University,2004:307-312.
4BERTLING L,ALLAN R,ERIKSSON R.A reliabil-ity-centered asset maintenance method for assessingthe impact of maintenance in power distribution sys-tems[J].IEEE Transactions on Power Systems,2005,20(1):75-82.
5ENDRENYI J,ABORESHEID S,ALLAN R N,etal.The present status of maintenance strategies andthe impact of maintenance on reliability[J].IEEETransactions on Power Systems,2001,16(4):638-646.
6BROWN R E,FRIMPONG G,WILLIS H L.Failurerate modeling using equipment inspection data[J].IEEE Transactions on Power Systems,2004,19(2):782-787.
7Probability Methods Subcommittee.IEEE reliabilitytest system[J].IEEE Transactions on Power Appara-tus and Systems,1979,98(6):2047-2054.
8Christianson R L et al. Avoiding hydrates in the petroleum industry. SPE27994,1994