期刊文献+

下组煤露头区导水裂缝带高度综合确定 被引量:5

Water-conducting Fissure Zone Height of Outcrop Area of Lower-group Coal-seam
下载PDF
导出
摘要 为了合理留设煤层露头区第四系防水煤柱,采前进行导水裂缝带高度预计是重要的基础工作之一。以滕州矿区新安煤业公司太原组下部16煤露头区以往勘探资料为基础,综合运用“三下规程”、裂采比计算方法、函数公式和数值模拟4种方法,对16煤露头区开采导水裂缝带高度进行了预计,并进行了对比分析。多种方法可互相弥补、验证,克服了单一方法的局限性。结果显示,16煤厚度取值1.05~1.37 m时,最大导水裂缝带高度为25.5~29.3 m。计算结果为留设第四系防水煤柱提供了依据,同时也为矿井防治顶板水提供了重要参数。 Water-conducting fissure zone height prediction is one of the important basic works before mining for rationally designing water-proof coal pillar.Based on past exploration information of 16 coal outcrop area of Xin'an Coal Company, Tengzhou mining area, applying the regulation of mining under buildings , railway and water body , fissure-to-mining ratio calculation method , function formu-la and numerical simulation , water-conducting fissure zone height was predicted and compared .Multi methods could mutually remedy , testify and overcome limitation of single method.Results showed that maximum water-conducting fissure zone height was 25.5~29.3 m when coalseam height was 1.05~1.37 m, which provided basis for coal pillar design and important parameters for roof water prevention .
出处 《煤矿开采》 北大核心 2015年第3期89-92,100,共5页 Coal Mining Technology
基金 国家重点基础研究发展计划(973)项目(2012CB723104) 国家自然科学基金(41372290 41402250) 山东省自然科学基金(ZR2013EEQ019) 山东省矿山灾害预防控制国家重点实验室培育基地(山东科技大学)开放基金资助(MDPC2012KF13) 山东科技大学科研创新团队支持计划资助项目(2012KYTD101)
关键词 露头区 导水裂缝带 防水煤柱 outcrop area water-conducting fissure zone water-proof coal pillar
  • 相关文献

参考文献13

二级参考文献103

共引文献731

同被引文献63

引证文献5

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部