摘要
以中海油渤海湾生产支持基地工程为例,介绍了一种采用大型振动锤、"半屏风式"钢板桩沉桩工艺,有效地克服了大型冷弯钢板桩因桩身扭转、带桩等因素造成的各种施工困难,证明了该工艺可行、高效。
Taking the project of the production supporting base at Bohai gulf of CPOE for example, we introduce the pile sinking technology using the large vibratory hammer and the half-screen, which resolve various kinds of difficulties caused by the pile twisting and pile dragging steel-sheet piles. The technology in the construction of the large-size cold bending is proved to be feasible and efficient.
出处
《水运工程》
北大核心
2015年第6期210-212,共3页
Port & Waterway Engineering
关键词
冷弯型钢板桩
振动锤
半屏风式
沉桩
cold bending steel-sheet pile
vibratory hammer
half-screen
pile-sinking