摘要
农村水电站的增效扩容有局部技改和报废重建等方法,是根据电站投产年限和设备设施的安全状况决定的。本文通过天台县内8座电站增效扩容试点工作积累的经验,介绍如何针对电站实际状况选择技改的内容和采用不同的技术方法,对增效扩容后的成果进行比较。
Efficiency increase and capacity expansion of rural hydropower station can be achieved by local technical improvement,scrap reconstruction and other methods,which are determined according to power plant production duration and safety status of equipment and facilities.In the paper,experience of efficiency increase and capacity expansion pilot work of eight power stations in Tiantai County is accumulated.How to select the contents of technical transformation and adopt different technical methods aiming at power station actual condition are introduced,and results after efficiency increase and capacity expansion are compared.
出处
《中国水能及电气化》
2015年第6期38-40,共3页
China Water Power & Electrification
关键词
农村水电
增效扩容
技术方法
rural hydropower
efficiency increase and capacity expansion
technical methods