摘要
在布达尔水电站设计过程中,针对新疆山区河流的特点,不限于某一种固定形式,不拘泥于固定经验,充分考虑到工程项目的具体情况,更新设计观念,拓展设计思路,依据工程设计实例,对拦河闸式引水枢纽和拦河堰式引水枢纽的优缺点作了具体的分析比较,并对该引水枢纽布置方式的必要性及合理性进行了相应的研究和探讨。
Design process of Budaer Hydropower Station is not limited to a fixed form or fixed experience aiming at characteristics of rivers in Xinjiang mountainous area.Concrete conditions of projects are fully considered,design concepts are updated,and design ideas are expanded.Advantages and disadvantages of river sluice water diversion hub and river weir water diversion hub are concretely analyzed and compared according to project design examples.Necessity and rationality of the water diversion hub layout mode are correspondingly studied and discussed.
出处
《中国水能及电气化》
2015年第6期62-65,共4页
China Water Power & Electrification
关键词
水电站
引水枢纽布置
拦河闸
溢流堰
hydropower station
water diversion hub layout
river sluice
overflow dam