摘要
以云南省渔泡江铁川桥水电站预应力锚索施工为实例,总结了变形岩体边坡预应力锚索的施工方法及工艺流程、质量管理技术措施及质量检验要点,评价了预应力锚索的施工质量及加固效果,变形岩体边坡预应力锚索施工取得了较好效果。
Construction of the prestressed anchor cables in Tiechuanqiao Hydropower Project is described.Construction methods and tech-nical flow, technical measures of quality control, key point of quality inspection of the prestressed anchor cable in treatment of the de-formed rockmass slope are summarized.The construction quality and reinforcing effect are evaluated.It presents that application of the prestressed anchor cables in the treatment of the deformed rockmass slope achieves the expected effect.
出处
《西北水电》
2015年第3期60-64,共5页
Northwest Hydropower
关键词
预应力锚索
变形岩体
边坡治理
prestressed anchor cable
deformed rockmass
slope treatment