结合橄榄坝水电站可行性研究报告,分析计算了机组运行过程中可能发生空蚀的几种工况,并确定了贯流式水轮机安装高程计算的主要参数,分析确定了机组合理的安装高程。
Based on the feasibility study report in Ganlan dam Station,and the analysis and calculation of the cavitation may occur several conditions during the process plant operation, and to determine the main parame- ters of Tubular Turbine Installation Elevation calculated,analyzed and determined a reasonable Turbine In- stallation Elevation.
出处
《吉林水利》
2015年第6期50-52,共3页
Jilin Water Resources
关键词
灯泡贯流式机组
吸出高度
安装高度
空化系数
Bulb Turbine Unit
height of aspiration
mounting height
cavitation coefficient