期刊文献+

复杂地层中大断面铁路隧道施工沉降控制技术 被引量:2

Settlement control technology of the large-section railway tunnel in complex strata
下载PDF
导出
摘要 以广深港客运专线深港隧道下穿深圳地铁1号线、地下商业街工程为例,论述了综合应用水平旋喷、长管棚、超前注浆和补偿注浆、CRD法开挖等技术,利用2套自动化仪器实时监控量测,及时反馈、指导施工,准确计算地铁结构底板下注浆位置和注浆量,分层分部位加固土体,精确控制沉降,确保运营的地铁安全运行,为同类隧道施工积累了可贵的资料和经验. Taking the Shengang Tunnel under the Shenzhen Metro Line 1 and a commercial street as an example, this paper discusses the comprehensive application of horizontal rotary jet grouting, long pipe roof, advance grouting, compensation grouting, and CRD excava- tion. With the help of two sets of automation instruments monitored in real time, the data can be timely fedback to accurately calculate the grouting position and quantity. The soils under the Metro floor are reinforced by layers and sections. The settlement is precisely con- trolled, and the Shenzhen Metro Line 1 is operated safely. The valuable data and experience are accumulated for the similar tunnel construction.
作者 刘文军
出处 《青岛理工大学学报》 CAS 2015年第3期11-16,共6页 Journal of Qingdao University of Technology
基金 中国铁路总公司科研项目(2011G013-D)
关键词 施工 技术 深港隧道 地铁 沉降控制 constructiom technology the Shengang Tunnel subway settlement control
  • 相关文献

参考文献4

二级参考文献29

共引文献76

同被引文献3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部