期刊文献+

X潜山油藏水平井二次开发项目经济评价 被引量:1

Economic Evaluation on Secondary Development Project of Horizontal Wells in X Buried Hill Reservoir
下载PDF
导出
摘要 X潜山油藏是位于大民屯凹陷的高凝油油藏,为改善该块低速低效的开发状况,决定利用水平井技术在该块实现二次开发。文章应用有无对比法,对区块水平井二次开发项目进行了分析评价。结果表明,实施水平井二次开发的增量内部收益率大于行业基准收益率,方案可行。 The X hill reservoir is high pour-point oil reservoir located Damintun Depression. In order to improve the reservoir development of low-inefficient situation, decided to use horizontal wells to achieve the secondary development. Application of with and without methods, we carried out the economic evaluation on secondary development project of horizontal wells. The result shows that implementation of the secondary development of horizontal wells incremental internal rate of return is greater than the industry benchmark rate of return, and project is feasible.
作者 封晓明
出处 《现代工业经济和信息化》 2015年第7期16-17,共2页 Modern Industrial Economy and Informationization
关键词 水平井 二次开发 经济评价 有无对比法 horizontal wells secondary development economic evaluation with and without methods
  • 相关文献

参考文献5

二级参考文献10

共引文献80

同被引文献24

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部