摘要
大岗山水电站是大渡河流域装机规模第二大的大型水电项目,也是流域经济指标最优的项目之一。经过近十年的建设,成功解决了在高烈度地震区筑坝的技术难题,在项目精细管理、对外协调、接机发电等方面摸索出一整套经验。项目建成投产对公司流域滚动开发,降低资产负债率,指导后续项目建设都有重大意义。
Dagangshan Hydropower Station is a large hydropower project with second largest instaUed capacity and one of the hydropower projects with best economic indicator in Dadu River Basin. After nearly a decade of construction, the technical problem of damming in high seismic intensity area is successfully resolved, and a set of experiences in project fine management, external coordination and coordination between construction and power generation are achieved. The operation of Dagangshan Hydropower Station has major significance on promoting the rolling development of Dadu River Basin, reducing the debt ratio of company and guiding subsequent project construction.
出处
《水力发电》
北大核心
2015年第7期1-4,共4页
Water Power
关键词
高烈度地震区
高拱坝
可持续发展
精细化管理
组织协调
大岗山水电站
high seismic intensity area
high arch
sustainable development
refine management
organization and coordination
Dagangshan Hydropower Station