摘要 大岗山水电站10 k V厂用电母线分为6段,为单母线分段接线方式,接线复杂,备自投动作逻辑也比较复杂。大岗山水电站10 k V厂用电系统采用了3套备自投装置,通过相应的逻辑程序控制,结合厂用电系统运行方式及相关规定,在最大程度保证厂用电系统安全、可靠、稳定供电的基础上来实现备自投功能。 The 10 kV bus of Dagangshan Hydropower Station is divided into six segments with a more complex wiring mode than the common single bus pieeewise mode, so the spare power automatic switching's logic is more complex. The 10 kV auxiliary power system of Dagangshan Hydropower Station adopts three sets of automatic switching device. Through corresponding logic program control and combined with the operation mode of auxiliary power system and relevant regulations, the automatic switching devices can realize the automatic switch-in function to the greatest extent on the basis of ensuring the safe, reliable and stable power supply of auxiliary power system.
作者 赵宇阳
出处 《水力发电》 北大核心 2015年第7期81-84,共4页 Water Power
关键词 厂用电系统 备自投 逻辑 大岗山水电站 auxiliary power system spare power automatic switching logic Dagangshan Hydropower Station
  • 相关文献

参考文献2

二级参考文献4

共引文献9

同被引文献11

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部