2PMI Standard Committee.A Guide to the Project Management Body of Knowledge(PMBOK Guide)[M].USA:2013.
3Fleming QW,Koppelman JM.Earned Value Project Management:A powerful tool for software projects[J] .The Journal of Defense Software Engineering, 1998:19-23.
4Kwak YH,Anbari FT.History,practices and future of earned value management in government:Perspectives from NASA[J].Project Management Journal,2012:77-90.
5Wilson B,Frolick M,Ariyachandra T.Eamed value management systems:challenges and future direction[J].Proceedings of DYNAA,2013(4):3-9.
6U.S.CDC.CDC unified process-process guide earned value management[Z]. 2007-12- 13.
7Anbari FT.Earned value project management method and extensions[J]. Project Management Journal,2003,34 (4): 12-23.
8Castro-Lacouture D,S fi er GA, Gonzalez- joaqui J,et al.Construetion project scheduling with time,cost,and material restrictions using fuzzy mathematical models and critical path method[J].Journal of Construction Engineering and Management,2009(10): 1096-1104.
9Shankar NR,Sireesha V,Phani Bushan Rao P.An analytical method for finding critical path in a fuzzy project network[J].Int J Contemp Math Sciences,2010, 20(5):953-962.
10Willy Herroelen,Roel Leus.On the merits and pitfalls of critical chain scheduling[J]. Journal of operations management,2001(19):559-577.