期刊文献+

大跨度斜拉桥数字化维护和管理系统的开发研究 被引量:1

Research Development of Digital Maintenance and Management System for Long-span Cable-stayed Bridges
下载PDF
导出
摘要 在哈尔滨松花江斜拉桥的背景下,开发了大跨度斜拉桥数字化维护和管理系统。该系统主要包括八个模块,有数据管理模块、检验和测量模块、评估模块、有限元分析模块、诊断和预测模块、维护模块、查询模块和帮助模块。该系统利用人工检查数据库、基础数据库和健康监测系统的数据,通过斜拉桥数字化维护与管理系统分析和计算,可以预测桥梁寿命,进行疾病诊断,通过全面评估分析,达到维护和管理桥梁的功能。因此,大跨度斜拉桥的维护和管理系统非常智能化及使用化。通过使用这个系统,可为大跨度斜拉桥及类似桥梁的维护和管理进行实时跟踪及管理指导。 In this paper,with the background of Harbin SonghuaRiver cable- stayed bridge,digital cable-stayed bridge maintenance and management system( DCBMS) was developed for the need of maintenance and management of long- span cable- stayed bridges. The major functions and theoretical application of eight modules include data management module,inspection and measurement module,assessment module,finite element analysis module,disease diagnosis and prediction module,maintenance module,query module and help module. By analyzing and calculating the data from manual inspection database,basic data- base and health monitoring subsystem, DCBMS can accomplish the functions like life prediction, disease diagnosis, comprehensive assessment,maintenance and management of bridges. Therefore,the maintenance and management of long- span cable- stayed bridges can be made digital professional and scientific. By running this system,a real time and specific technical guidance can be provided for the maintainers and managers of long- span cable- stayed bridges.
作者 曹银涛
出处 《北方交通》 2015年第6期130-132,共3页 Northern Communications
关键词 斜拉桥 系统的开发 维护和管理 综合评估 Cable-stayed bridges System development Maintenance and management Comprehensive assessment
  • 相关文献

参考文献2

二级参考文献16

  • 1介玉新,胡韬,李青云,李广信.层次分析法在长江堤防安全评价系统中的应用[J].清华大学学报(自然科学版),2004,44(12):1634-1637. 被引量:61
  • 2赵建强.既有城市桥梁结构常见病害与评估方法综述[J].甘肃科技,2005,21(9):132-134. 被引量:2
  • 3Wan Yucheng,Ma Baoguo,Sheng Zhaohan.Ranking method for the reciprocal judgment matrix based on the unascertained three-valued judgments[J].Journal of Systems Engineering and Electronics,2006,17(1):115-120. 被引量:4
  • 4项海帆 李瑞霖 杨昌众.悬浮体系斜张桥的近似抗震计算[J].结构工程师,1985,(2).
  • 5Eurocode 8:Structures in Seismic Regions Design[S],Part2:Bridges,April 1993
  • 6H.M. ALI and A. M. Abdel-Ghaffar. Seismic Energy Dissipation for Cable-Stayed Bridges Using Passive Devices [J]. E.E. S. D.,Vol. 23,1994
  • 7Charles Seim P. E. The Seismic Retrofit of the Golden Gate Bridge [A], PRC-US Workshop on seismic analysis and design of special bridges, Shanghai, October 2002
  • 8Roelfstra G,Hajdin R,Adey B,et al.Condition evolution in bridge management systems and corrosion-induced deterioration[J].Journal of Bridge Engineering,2004,9(3):268-277.
  • 9Yousset M A,Anumba C J,Thorpe T.Intelligent selection of concrete bridge construction methods in egypt[C]//Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering.United States:American Society of Civil Engineers,2005:1751-1764.
  • 10Hurley W J.The analytic hierarchy process:a note on an approach to sensitivity which preserves rank order[J].Computers and Operations Research,2001,28(2):185-188.

共引文献109

同被引文献6

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部