摘要
本文结合高速公路施工从高填路基、桥台台背沉降、施工方法、填筑材料和结构原理上对高速公路桥台台背质量影响因素及桥头跳车现象进行原因分析,并提出减少病害防治措施。
Combined with expressway construction, this article analyzes the factors affecting the quality of abutment back and vehicle bump at bridge head from high subgrade, abutment back settlement, construction method, filling materials and the structure principle and proposes measures to reduce the disease.
出处
《价值工程》
2015年第20期87-88,共2页
Value Engineering
关键词
桥台台背
质量影响因素
桥头跳车现象
原因分析
abutment back
factors affecting the quality
vehicle bump at bridge head
causes analysis