3Ray C Williams, George J Pandelios, Sandra G Behrens. Evaluation (SRE) Method Description (Version 2.0), CMU/SEI-99-TR- 029, ESC-TR-99-029, 1999.
4Elaine M Hall. Managing risk--Methods for Software System Development. Addison-Wesley, 1998, pp.225.
5Barry W Boehm Software Risk Management, IEEE Computer Society Press, 1993.
6Ronald P Higuera, David P Gluch, Richard L Murphy. An introduction to team risk management, Special report CMU/SEI, SEI/ CMU, Pittsburg, PA, May 1994.
7David P Gluch, Audrey J Dorofee, Elizabeth A Hubbard, John J Travalent. An collaboration in implementing team risk management, Technical Report, CMU/SEI-95-TR-016, March 1996.
8Ayad Ali Keshlaf, Khairuddin Hashim. A Model and Prototype Tool to Manage Software Risks, IEEE 2000.
9Jamie L, Smith Shawn A, Bohner D, Scott McCrickard. Project Management for the 21st Century: Supporting Collaborative Design through Risk Analysis. 43rd ACM Southeast Conference, Kennesaw, GA,USA, March 18-20, 2005.
10M R Lu, J S Yu, S R Dalai, ARMOR: Analyzer for Reducing Module Operational Risk, Twenty-Fifth International Symposium on Fault-Tolerant Computing, 1995, p. 0137.