岩溶区导流洞汛前封堵风险分析与对策措施 被引量:1

Risk analysis and measures of blocking diversion tunnel in karst region before the flood season
下载PDF
导出
摘要 为实现平寨水库汛前下闸蓄水目标,对导流洞开挖揭露的溶洞及裂隙、临近汛期洪水量级大、水库水位上升快,由此可能出现衬砌结构失稳破坏、涌水量大导致封堵失败进行了风险分析。经充分论证和精心施工,完成了导流洞提前封堵,为类似强岩溶发育区大断面导流洞汛前下闸蓄水提供参考。 To achieve the goal of restaining water of Pingzhai Reservoir before the flood season, the risk of blocking diversion tunnel unsuccessfully was analyzed. It caused by the cave and fissure from excavating the diversion tunnel, reservoir water level rising quickly, the unstability of the lining structure and large water inrush. Due to full demonstration and careful construction, blocking diversion tunnel was accomplished beforehand which provided a reference for restaining water of diversion tunnel before the flood season of the large section of similar strong karst area.
作者 张健 吴开龙
出处 《中国水利》 2015年第12期49-51,共3页 China Water Resources
关键词 岩溶区 导流洞 封堵风险 对策 Karst area diversion tunnel plugging risk countermeasure
  • 相关文献

参考文献10

二级参考文献10

共引文献32

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部