摘要
对某铁矿斜坡道探治水工程进行了优化研究,在探治水过程中,结合围岩地质条件和施工环境,在设备选型、探水施工、注浆方案上不断调整,并在施工组织上进行了改进,实现了探孔、注浆同时作业,逐步形成了一套成熟的施工方案,提高了探治水效率,注浆效果良好。
The research on scheme optimization for detecting and controlling groundwater for the ramp in an underground mine was presented. The scheme for groundwater detection and control was adjusted for several times in terms of equipment selection,groundwater detecting,grouting for prevention,with the geological condition of wall rock and construction condition taken into consideration. With the construction being well organized,the water hole drilling and grouting can be operated at the same time,gradually becoming a fixed construction scheme for the iron mine,which has proven to increase the efficiency in groundwater detection and control with a good grouting effect.
出处
《矿冶工程》
CAS
CSCD
北大核心
2015年第3期31-33,36,共4页
Mining and Metallurgical Engineering
关键词
斜坡道
探水
治水
注浆
铁矿山
ramp
groundwater detecting
groundwater control
grouting
iron mine