项目群进度管理的研究与实践 被引量:18

The Research and Practice of Program Schedule Management
下载PDF
导出
摘要 为更有效地解决大型企业投资项目群的进度管理问题,结合项目群进度控制实践,提出建立一个科学合理的项目群进度管理体系;该体系在项目群工作分解结构(WBS)的基础上,利用横道图、网络计划技术等科学工具编制项目群进度计划,对进度影响因素进行识别与排序,并采用S型曲线进行有效的控制,进而分析偏差并提出改进措施。通过在中海油基建管理有限责任公司以往参建的大型建设项目中的应用实践,证明了该进度管理体系在控制项目群进度方面的精确性与有效性。 The paper establishes a scientific and rational schedule management system based on the program management by combining with the practice of the program schedule control for more effectively solving the program schedule management problem of large enterprises. On the basis of program work breakdown structure(WBS),the schedule management system makes use of scientific tools,such as bar chart,network planning technique,to identify and sort schedule influence factors,uses S-curve to control the schedule effectively,and then makes deviation analysis to propose improvement measures. Then it proves that the schedule management system has the accuracy and effectiveness in program schedule control through the schedule management system application in the large-scale construction projects which CNOOC Infrastructure Management Limited Liability Company participated in.
出处 《工程管理学报》 2015年第3期126-130,共5页 Journal of Engineering Management
关键词 项目群 进度管理体系 工作分解结构 横道图 网络计划技术 S型曲线 program schedule management system work breakdown structure bar chart network planning technique S-curve
  • 相关文献

参考文献6

  • 1张俊光.基于三法融合的软件项目进度估计方法研究[J].中国软科学,2009(1):175-181. 被引量:5
  • 2李平,顾新一.R&D项目进度费用风险优化的研究[J].管理工程学报,2006,20(2):14-18. 被引量:7
  • 3Amol Singh. Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process[J]. Procedia Engineering, 2014 ( 69 ): 725-734.
  • 4K. Yaghootkar, N. Gil. The Effects of Schedule-driven Project Management in Multi-project Environments[J]. nternational Journal of Project Management, 2012 ( 30 ): 27-140.
  • 5Tyson R. Browning, Ali A. Yassine Multi-project Scheduling: Priority rule performance revisited[J]. Int. J. Production Economics, 2010 ( 126 ): 212-228.
  • 6Vahid Majazi Dalfard, Vahid Ranjbar. Multi-project Scheduling with Resource Constraints &Priority Rules by the USE of Simulated Annealing Algorithm[J]. Tehni~ki vjesnik, 2012 (3): 493-499.

二级参考文献19

  • 1L. H. Putnam and W. Myers. Industrial Strength Software - Effective Management Using Measurement [ M 1. IEEE Computer. IEEE Computer Society Press, 1997.
  • 2Nan- Hsing Chiua and Sun- Jen Huang. The Adjusted Analogy -Based Software Effort Estimation Based on Similarity Distances [ J]. Journal Of Systems and Software. April 2007, 80(4) : 628 -640.
  • 3张俊光 吕廷杰.软件项目监督与控制方法研究.中国管理科学,2006,(10):127-132.
  • 4Pappas, D. Contingency Reserves: False Expectation and Misconceptions [ C ]. Fifth European Project Management Conference. June 19 -20, 2002. Cannes, France.
  • 5Heimann, J. F. Contingency Planning as a Necessity Proceedings of the Project Management Institute Annual Seminars & Symposium. September 7 - 16, 2000. Houston, Texas, USA.
  • 6Amir Azaron and S. M.T. Fatemi Ghomi. Lower Bound for the Mean Project Completion Time in Dynamic PERT Networks [ J ]. European Journal of Operational Research. 1 April 2008, 186( 1 ) : 120 - 127.
  • 7田俊国.软件项目规模估计方法介绍[EB].http://pm.csai.cn/cost/N0044.htm.
  • 8美国项目管理学会著.项目管理知识体系指南(第三版)[M].卢有杰,王勇译.北京:电子工业出版社,2005.121-122.
  • 9张俊光.软件项目管理的若干关键问题研究[D].北京邮电大学博士学位论文,2007.7:35-37.
  • 10Dolado J J. On the Problem of the Software Cost Function [J]. Information and Software Technology, 2001, (43): 61 -72.

共引文献10

同被引文献116

引证文献18

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部