摘要
本文从变电站土建设计出发,以实际工程设计中可行性研究阶段、初步设计阶段土建专业的总平面布置、竖向布置及建筑结构方案的选择是否合理,进行探讨和分析,以优化整个工程的设计方案;在选用南方电网标准设计模块的前提下满足使用要求的同时根据实际情况对标准设计进行优化,并提出全户内变电站在现阶段的技术创新方案,以实现变电站全过程、全寿命周期的合理规划设计。
This article embarked from the substation construction design, combining with practical engineering feasibility study stage, the preliminary design stage in the design of civil engineering specialty of general plot plan, vertical layout and architectural structure estimated whether this designs were reasonable, and carried on some discussion and analysis, to optimize the whole project design; In selecting southern power grid under the premise of standard design module according to actual condition meet the requirement of design is optimized to the standard at the same time, and put forward the whole indoor substation technology innovation plan at this stage, should be paid more attention when drew construction design, came true the whole process and the whole life cycle of reasonable planning and design of substation.
出处
《贵州电力技术》
2015年第7期89-91,94,共4页
Guizhou Electric Power Technology
关键词
土建设计
全户内
总平面布置
竖向布置
设计优化
施工图
细节
civil engineering design
indoor
layout
vertical layout
design optimization
construction drawing
details