文中结合电力系统巡视中发现的110kV某变电站某组合电器SF6气体渗漏问题案例,分析了缺陷原因,给出了缺陷处理办法,并提出了避免此类缺陷的措施和建议。
The leakage of composite apparatus SF6 gas in an 110 kv substation is found in the power system inspection.Based on this case,we analyze the causes of defect,provide the treatment method of defect,and put forward the countermeasures and suggestions to avoid such defects.